Barry's Model Railroad

Barry's Model Railroad

Search This Blog

Showing posts with label Michigan Northern Railway. Show all posts
Showing posts with label Michigan Northern Railway. Show all posts

Wednesday, February 18, 2015

Michigan Northern Railway

From Wikipedia( View original Wikipedia Article )
Michigan Northern Railway
LocaleMichigan
Dates of operation
Reporting Mark
1976–1986

 MIGN
SuccessorTuscola and Saginaw Bay Railway
Track gauge4 ft 8 12 in (1,435 mm)standard gauge
HeadquartersCadillac, Michigan

The Michigan Northern Railway (reporting mark MIGN) was a railroad operating in the northwestern Lower Peninsula of Michigan. The main line stretched from a southern hub at Grand Rapids to a northern terminus at Mackinaw City. It operated from 1976 until 1986.

History

The Michigan Northern's trackage consisted of the northern half of the main line built between 1867 and 1882 by a predecessor railroad, the Grand Rapids & Indiana Railroad. During the 1900s, the spread of paved roads and altrernate means of transportation reduced the profitability of this line. Although the GR & I main line was consolidated into the Pennsylvania Railroad and successor Penn Central (PC), usage continued to decline. The bankrupt PC won permission from the federal government to abandon lengthy sections of trackage in northern Michigan.
An intervention by the Michigan Department of Transportation prolonged the working life of the old GR & I main line. The state acquired most of the trackage and contracted with the Michigan Northern (MN) to operate it. The MN also offered service on branch lines to Charlevoix andTraverse City during their period of service. At the railroad's northern terminus, the MN turned freight cars over to the Detroit & Mackinac Railway, which switched them onto the SS Chief Wawatam, a railroad ferry that crossed the Straits of Mackinac. This allowed the MN to offer through freight service to Michigan's Upper Peninsula. A controversial rate "flag-out" starting in 1978 resulted in a rush of overhead traffic from the ferry onto the Michigan Northern. This soon went away after nationwide railroad deregulation in 1980.
The economic recession of the early 1980s forced the state of Michigan to reduce its subsidies to northern Michigan railroads and their customers. MN service ended in fall 1984 from Reed City to Grand Rapids (Comstock Park). A section of the former MN trackage stretching from Cadillac to Petoskey continued in service under another contractual operator, the Tuscola & Saginaw Bay Railway (now the Great Lakes Central Railroad); MN trackage between Grand Rapids and Cadillac was redeveloped as the White Pine Trail State Park.
The line from Petoskey to Charlevoix closed due to severe erosion of the land and thus making the track unusable. MN cut back to the 33-mile stretch from Bay View to Pellston, which had not been purchased by the state of Michigan. MN set up a purchase agreement with PC (which still owned the track), and established a truck-to-rail transfer facility at Pellston. Canadian Steel trucked to Pellston; MN hauled it to the Tuscola & Saginaw Bay interchange near Petoskey. This ended in January 1986.
In summer 1986, MN operated excursion trains. However, MN ran short on track payments to PC, and MN's last train left Pellston in April 1987. The line survived another five years (from Alanson to Petoskey) with the Little Traverse Scenic Railway, which used a MN GP-7 Locomotive in their first year of operation.

Thursday, October 30, 2014

Detroit, Toledo & Ironton Railway And The Ann Arbor Railroad

From Wikipedia
The Detroit, Toledo & Ironton Railway (DT&I) obtained control of the AA in 1905 but sold its interests in 1910. In 1925 the Wabash Railroad, which was controlled by the Pennsylvania Railroad (PRR) interests, acquired control of the AA. In 1963, the Wabash sold the AA to the DT&I (which was owned by the Wabash and the PRR). On October 16, 1973, AA declared bankruptcy. AA ceased operation as a railroad on April 1, 1976; Conrail assumed operations that day. The state of Michigan then purchased the railroad from the DT&I and arranged for its operation by Michigan Interstate Railway. The remaining train ferry lines from Elberta to Manitowoc (79 miles (127 kilometres)) and Kewaunee (60 miles (97 kilometres)) ceased operation in April 1982. In 1983 because of disputes over terms and payments, the operation was split among three railroads:
In 1984 T&SB took over MN's portion of the AA.
On October 7, 1988 a new Ann Arbor Railroad began operating the portion south of Ann Arbor; the Great Lakes Central Railroad (the former T&SB) currently serves the remaining portions of the line. Some sections have been abandoned: from Yuma to Elberta and Frankfort (approximately 45 miles (72 kilometres)), approximately 10 miles (16 kilometres) in Shiawassee County, Michigan (in three discontinuous sections), and the trackage around the now-demolished Cherry Street Station in Toledo.
More on the DT&I
In June 1905, the Detroit, Toledo & Ironton Railway (DT&I) took control of the Ann Arbor Railroad (AA), which they purchased from Rudolph Kleybolte & Co.[4] The AA connected Toledo with Frankfort, Mich., and the acquisition essentially doubled the DT&I system. DT&I only controlled the AA until 1908 when another bankruptcy forced the DT&I to divest its acquisition.
In 1963, the DT&I, itself by then a subsidiary of the Pennsylvania Railroad, once again gained control of the AA. The Ann Arbor lines would later become part of the formation of Conrail in April 1976 but were still facing abandonment. They were purchased by the state of Michigan in October 1977 with the intent of preserving rail service over its tracks. Subsequently, the state divested itself of the lines and remnants of the AA are now owned and operated by several short line railroad companies (including one with the same name as the original).